List of our few achievements and current project for the control and appraisal of engineering structures / Geotechnics
N.W. M
Underwater control of the infrastructure construction works of the port of Nador West Med.
IWATA CHIZAKI INC JAPAN
Underwater control and assistance for the establishment of a seawater intake system at AMSA.
OCP
Underwater control of the Jorf Lasfar offshore gypsum discharge network.
KELLER-France
Underwater control and assistance as part of the re-encroachment work of the TC4 wharf at the port of Tangier Med 2.
A.N.P
Control submarine development work of the new marina area to the port of Al Hoceima.
Marsa Maroc
Underwater inspection of the work to restore the B station of the oil terminal at the port of Mohammedia.
SGTM
Submarine control and technical assistance for the installation of a seawater pipe with a linear distance of 1400m at AKHFENIR.
SRPTM
Underwater inspection as part of the work to remove the wreckage sunk in the pass of the city of Tangier.
ONEEP
Expertise and maintenance of hydropneumatic equipment in the sluices at the EL KANSERA dam.
SOMAPORT
Ltopographic survey, Underwater cartography of the quay, Spear surveys at the foot of the quay, Horizontal concrete cores and laboratory analysis, at the port of Casablanca.
Some IWS renewal inspections carried out since 2019
INTERORIENT
MV SPANACO LOYALTY
JORF LASFAR
B-V
MRC
HATICE ANA
MOHAMMADIA
B-V
SGTM
CAN BEY
SAFI NEW PORT
B-V
SCRA
YACOUB
CASABLANCA
B-V
SRN
VB SAHEL
NOUADIBOU
B-V
SRN
VBSAHARA
NOUADIBOU
B-V
BOLUDA
VB CIRES
TANGIER MED
B-V
BOLUDA
VB MALABATA
TANGIER MED
B-V
MARSA MAROC
ORIENTAL
NADOR
LLOYDS
MARSA MAROC
AL QODS
SAFI
B-V
MARSA MAROC
AL ARQ
NADOR
B-V
INTERNATIONAL MARITIME SERVICE
M/T BALEA
TANGIER MED 1
B-V
SOMIT AFRIQUE
M/N BONITA
KENITRA
RINA
TOMINI
TOMINI
JORF LASFAR
LLOYDS
INTERSHIPPING SARL
MED STAR
TANGIER MED 1
RINA
INTERSHIPPING SARL
JET DETROIT
TANGIER
DNV-GL
JAN DE NUL
GENERA
NADOR WEST MED
B-V
SEATRADE
CLIPPER ORIENT
JORF LASFAR
DNV-GL
List of our few achievements and current project for the control and appraisal of engineering structures / Geotechnics
SGTM-STFA
Underwater works relating to the construction of the new port of Safi.
- Construction of the service dock
- Construction of the cereal plant
- Installation of acropod blocks for protective structures
Various works (mining, docking equipment, etc.)
ONEEP
Rehabilitation of the water intake system at the EL KANSERA dam.
SRPTM
- Removal and refitting of HDPE omegas on the TCC raising quay at the port of Tangier Med 1.
- Core drilling, reinforcement and concrete injection work on the facing of the quay raising the TCC at the port of Tangier Med 1.
- Concrete high points excavation work at the TCC at the port of Tangier Med 1.
Coating of the quay blocks with bi-composite epoxy resin.
ONEEP
Aerator maintenance work at the Sidi Mohamed ben Abdellah dam Bouregreg complex.
SMM